BC Hydro
- Sechelt, BC - 16 km of 138 KV
- Restring and repole
- Conductor size 636 KCM
- Repole seventy and eighty foot poles in mountainous, off road
terrain
- Full time on site inspection including a safety and environmental
inspector
BC Hydro - Bowen Island, BC
- Voltage conversion on 1100 poles
- Change all transformers (approximately 400)
- Change all high voltage insulators (hot) on 1100 poles
Holberg, BC - 60 km of 336 ACSR
- New construction of 750 sixty to seventy foot poles, off road
- Excavator and crane erection
- Work completed for the Federal Government and Western Forest
Products Logging and the Community of Holberg
- Inspection on site by Signma Engineering of Vancouver